Landscape Implementation
Earthworks and grading, hardscape, decorative stone, tree and shrub planting, turf and seeding.
Landscape implementation is building the designed garden on site. Doing the work in the right order, from preparing the soil to planting the last shrub, decides whether the result lasts.
Because we have our own nursery, we can bring plants in at the right size and at the right time. We can build from our own design or from one you already have.
What is included
- Earthworks and grading
- Drainage and groundwork
- Hardscape
- Decorative stone
- Tree and shrub planting
- Seasonal flowers and ground cover
- Turf laying and seeded lawns
- Coordination with the irrigation installation
How we work
- 01
Site preparation
We clear and mark out the site, then fill and grade the soil to the levels in the design.
- 02
Groundwork and hardscape
Irrigation lines, drainage and hard surfaces such as paths are finished before planting.
- 03
Planting
We plant trees and shrubs in their planned positions, then ground cover and seasonal plants.
- 04
Lawn and stone
We lay or sow the lawn and lay the decorative stone.
- 05
Handover
We walk the site with you and give written guidance on early care for the plants.
Who it is for
For owners of houses, estates, public buildings and factory grounds who have a design ready or have had it done with us. You can have a whole site built or only one part of it.
Frequently asked questions
How long does a garden take to build?
It depends on the size of the site, the amount of hard landscaping and the weather. A small private garden can take a few weeks; estates and sites in several parts can take months. We confirm the programme after the survey.
When is the right season to plant?
For trees and shrubs, autumn and early spring are generally best; planting in hot summers or hard winters needs more careful watering and protection. Container plants can go in all year, but care varies with season and species.
Turf or seed: which is better for a lawn?
Turf gives a green surface quickly and costs more. Seed is cheaper but takes longer to establish and needs regular watering in the first weeks. The choice depends on budget, timing and how the lawn will be used.
Do I need to be on site while the work is done?
No. Meeting at the start and at handover is enough; we keep you informed and ask for your approval on important decisions.
Who is responsible for plants taking root after handover?
We settle this in writing at quotation stage. Because survival also depends on watering and care after handover, we suggest planning maintenance together with implementation.
Contact
Tell us about your project, garden or plant needs and let's plan it together.